Posted by: Patrick | February 12, 2011

Mock up Check ride – 02/12/2011

Today I flew with our chief pilot as part of the preparation for my check ride.
We reviewed a lot of the check ride possible scenarios. We start by working on instrument flight and hood work. After that we get to the practice area and did power on/off stalls, slow flight stall, steep turns, slow flight. We also worked on ground reference maneuvers, rectangle course, S turns and turn around a point.

After getting back to airport, I did one regular landing, Short field takeoff and landing and Soft field take off and landing.

My instructor was overall satisfied and described me the areas that I still need to work and polish it up.

Total Flight time: 2.3 hrs
Landings: 3

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Categories

%d bloggers like this: